Step-by-step practice

Workshop methods

Choose a procedure for its tools, materials, and working steps. For explanations of the materials and techniques, read the handbook.

New to urushi? Read Safety First before handling lacquer.

01

Building a furo

Set up a humidity-controlled curing box.

Steps
7
Videos
2
Handling
Preparation only
02

Preparing the substrate

Prepare the surface before applying lacquer.

Steps
7
Videos
6
Handling
Preparation only
03

Kokuso and sabi

Fill gaps and level the surface with lacquer-based fillers.

Steps
7
Videos
6
Handling
Direct urushi handling
04

Nunokise — cloth reinforcement

Reinforce the workpiece with cloth and lacquer.

Steps
7
Videos
4
Handling
Direct urushi handling
05

Shitaji — building the ground

Build, cure, and level the foundation layers.

Steps
9
Videos
5
Handling
Direct urushi handling
06

Fuki-urushi

Apply, wipe back, and cure a thin lacquer finish.

Steps
7
Videos
8
Handling
Direct urushi handling
07

Naka-nuri — the middle coats

Apply and level the middle coats.

Steps
6
Videos
8
Handling
Direct urushi handling
08

Uwa-nuri and nuritate

Prepare and apply the final lacquer coat.

Steps
7
Videos
8
Handling
Direct urushi handling
09

Roiro — polishing to a mirror

Level and polish a cured lacquer finish.

Steps
8
Videos
5
Handling
Some urushi handling
10

Hira maki-e

Draw in lacquer and apply metal powder.

Steps
7
Videos
6
Handling
Some urushi handling
11

Kintsugi with real urushi

Repair ceramics using lacquer and metal powder.

Steps
9
Videos
8
Handling
Direct urushi handling

How these are built

Watch the original demonstrations.

Steps link to their sources. Illustrations are video frames checked against the step they accompany. Workshop differences and gaps in the source material are noted within each method.

See the sources →